Skip to main content

How to brief a commercial maintenance job

Write a useful maintenance brief for a shop, office or other occupied business premises. Compare scope, access, downtime and handover before choosing a contractor.
Blake Folgado, Co-founder, Tradehand5 min read
A clay facilities manager walks an engineer through a small office plant room, pointing at a boiler

What should a commercial maintenance brief include?

A commercial maintenance brief should describe the outcome you need, the exact area or equipment involved, operating hours, access, known site risks, allowed interruptions and the documents needed at handover. Name the people who can arrange access, approve a change and receive the invoice. Send the same brief to each contractor so their quotes answer the same job.

This is for a business, facilities contact or property manager buying maintenance for premises. For construction work in Great Britain, a commercial client has duties under CDM 2015; a small price or short visit does not make the project domestic. Use HSE’s commercial client guidance to establish the arrangements your project needs.

Source: HSE: commercial clients under CDM 2015 (Great Britain)

Describe the result, not just “general maintenance”

List each work item and location. “Make good scuffed walls” leaves the quantity, preparation and finish open. “Repaint the marked sections of the ground-floor corridor to match the recorded finish, with areas confirmed at the site visit” gives the contractor a clear starting point while preserving what still needs checking.

Separate three things:

  • Requested outcome: the work or assessment you want completed.
  • Known site facts: drawings, equipment labels, earlier reports and occupied areas.
  • Unresolved questions: measurements, underlying cause, work method, or permissions still needing confirmation.

If the problem needs diagnosis, ask for an assessment with a clear charge and report deliverable before a repair quote. Do not ask bidders to price an invented cause. For a service with a published scope, use the relevant service description to check what your request includes.

Copy this site and work brief

FieldComplete before pricing
WorkItem and location ___; required result ___; quantity confirmed or to survey ___.
PremisesSite address ___; occupied areas ___; opening hours ___; other planned work ___.
AccessSite contact ___; arrival/sign-in route ___; loading/parking ___; keys or escort arrangement ___.
OperationsAllowed work window ___; noise/dust restrictions ___; any proposed service interruption to agree ___.
Site informationRelevant reports/plans ___; known hazards ___; site rules and emergency arrangements ___.
DecisionsWho approves price and changes ___; who agrees interruptions ___; purchase order needed ___.
HandoverWork summary ___; agreed reports/certificates ___; unresolved item list ___; receiving person ___.
BillingLegal billing name ___; invoice contact ___; job/order reference ___; agreed payment terms ___.

Share security and personal contact details through the direct job route rather than publishing them in an open tender document. Mark missing information clearly and agree who will supply it before the affected work is priced or starts.

Give the contractor the site information early

HSE’s contractor guidance for employers covers identifying the job, selecting a suitable contractor, sharing relevant information, coordinating risks and checking the work. Tell the contractor about the operating environment; ask how their work will affect staff, visitors and other contractors. Agree the practical controls and site arrangements with the responsible people before the visit.

For premises subject to the asbestos duty to manage in Great Britain, HSE says relevant asbestos information should be supplied early for planned work, including when requesting a quote. The responsible site contact should provide the register, plan and arrangements relevant to the work. An empty box in a brief is not evidence that asbestos is absent. Obtain the information or assessment needed before work that could disturb the building fabric proceeds.

Give the contractor time to review the information and raise questions. A standard risk-assessment document attached to a quote is not, on its own, an agreed plan for this site.

Sources: HSE: using contractors, a guide for employers, HSE: providing asbestos information before work (Great Britain)

Compare quotes for the same work window and outcome

Use the same revision of your brief and record each contractor’s exclusions. If one needs a survey, compare the survey stage before treating its later repair cost as fixed.

  • Which listed items, quantities, materials and finish are included?
  • Are access equipment, protection, making good and waste removal included where needed?
  • Does the price cover the required working hours and number of visits?
  • What interruption is proposed, who must agree it and what is the handback arrangement?
  • Which reports, certificates or test records will be supplied for the actual work?
  • What is the total and VAT treatment, and how are changes and payment handled?

The quote comparison guide helps organise scope differences. For a business purchase, agree the contract and purchase-order arrangements that apply to your organisation. Do not apply a household consumer cancellation rule to a commercial order.

A fictional occupied shop example

Fictional example: a shop manager requests repair and redecoration of one damaged stockroom wall. The manager wants the existing finish retained. The wall dimensions and cause of damage need checking at a site visit.

The brief identifies the stockroom, photographs the visible damage, gives the shop’s opening hours and states that deliveries use the same corridor. The manager asks bidders to inspect before quoting, describe preparation and protection, and propose a work window. The building manager supplies relevant site information and confirms how the contractor will enter.

One quote includes preparation, matching the finish, protection and waste removal. Another says “paint wall” and excludes preparation. The manager asks the second contractor to price the same scope before comparing totals. Neither offer is accepted just because it is the lower number.

Before work, the named approver agrees the scope and the site contact confirms the corridor arrangement. If the contractor finds damage beyond that scope, the approver receives a separate change proposal. At handover, the manager receives the work summary and a list of any unfinished items. The invoice goes to accounts with the agreed order reference.

Keep interruption and handover decisions visible

Add the person who can authorise a service interruption, the affected equipment and areas, the agreed isolation window and the person who receives the area back. Distinguish contractor working time from the time the business cannot use the affected space or equipment.

For electrical work, attach the circuit schedule or previous report where held and ask the contractor to identify investigation separately from repair. Use the commercial electrical scope guide and EICR repair brief for those tasks. When choosing a contractor for that electrical scope, browse electricians by town or postcode and confirm their commercial work and site requirements. Do not infer that a generic maintenance quote includes inspection, testing or shutdown arrangements.

Separate a one-off job from a maintenance agreement

A one-off repair quote does not establish an ongoing response service. For planned recurring maintenance, ask for the asset or task list, visit frequency, included work, exclusions, reporting and renewal terms. Use the property maintenance schedule to record agreed tasks and visit results. Keep reactive callouts and out-of-hours charges separate. A promised response time should say whether it means answering, attending or resolving the problem.

For this first job, keep a copy of the brief, accepted quote, approved changes and handover record. Check that the area can be returned to the agreed use and that any outstanding action has a named owner. Then find a relevant tradesperson and ask whether they handle your commercial work and site requirements. Describe the setting when you start a quote request; a directory listing alone does not establish that a provider meets your procurement requirements.

A phone showing a message beside a price tag

What needs doing?

Tell us what you need done. We'll tell you the price, then find a local tradesperson to do the job.

Sources and references

Blake Folgado

Blake is a co-founder of Tradehand, a UK trades marketplace More from Blake

Frequently asked questions

Can I use a domestic repair brief for an office or shop?

Use the same clear work description, but add operating hours, staff and visitor access, site rules, interruption arrangements, billing and procurement requirements. Establish the duties and contract that apply to the commercial work.

Do small maintenance jobs need site information?

Yes, provide the information relevant to the work and the risks. For construction projects in Great Britain, HSE’s commercial client guidance applies whatever the project size. The arrangements should be proportionate to the work.

What should I do if the scope cannot be confirmed from photos?

Arrange a site assessment and confirm its charge and report before seeking a firm repair price. Record the quantities or findings that each contractor still needs rather than inventing them.

Does a quote include out-of-hours work?

Only if that working window is included in the offer. Ask the contractor to price your actual site hours and state any additional visits, callouts or out-of-hours charges separately.

What documents should I ask for at handover?

Agree the work summary, any reports or certificates required for that work, and the unresolved-item list before accepting the quote. Name who receives them and who will check the result before the area returns to use.

Find a tradesperson for your next job

Tell us what needs doing and we'll find the right trade.

A clay decorator rolling sage green paint onto a living room wall
A clay carpenter hanging an oak internal door
A clay tiler taking a phone payment from a homeowner after a job
A clay plasterer smoothing a bedroom wall with a trowel
A clay electrician testing a socket in a living room
Two clay tradespeople sharing a business card beside an open van