Skip to main content

Commercial EICR Cost

In the UK, a commercial EICR is priced on survey. Get an Instant Quote. Last updated October 2026.

A commercial EICR is priced on survey. The price follows the boards and circuits in scope, access, isolation planning, and whether testing has to happen outside business hours.

What affects the price

  • The number of circuits and distribution boards to inspect and test
  • Single-phase or three-phase supplies and the complexity of connected equipment
  • Access to boards, circuits, and accurate existing schedules or drawings
  • The isolation plan needed to protect staff, customers, stock, servers, refrigeration, or production
  • Out-of-hours work and return visits agreed to reduce disruption

What’s included

  • An agreed scope covering the installation, boards, and circuits to be inspected
  • Visual inspection and dead and live tests appropriate to the installation
  • A schedule of circuit test results and coded observations
  • An overall satisfactory or unsatisfactory assessment in the written EICR

Good to know

How long does it take? Duration is driven by the circuit count, number of boards, access, and isolation plan. Ask the inspector to state the circuits included and how testing will be phased before accepting the quote.

Do I need one? HSE's guidance on regulation 4(2) of the Electricity at Work Regulations 1989 says the obligation to maintain arises only if danger would otherwise result, and that maintenance should be sufficient to prevent danger so far as is reasonably practicable. How often inspection and testing are carried out is a matter for the judgement of the dutyholder.

Before you book, read how to check an electrician is qualified.

How to pay less

  1. Provide the previous EICR, circuit schedules, drawings, and access details before quotation
  2. Agree which circuits can be isolated during normal hours and which require a planned shutdown
  3. Make every distribution board and test point accessible before the inspector arrives
  4. Compare quotes using the same circuit count, scope, exclusions, and reporting requirements
  5. When remedial labour follows failed circuits, compare the quoted labour against Tradehand's Commercial Electrician Rates guide before you accept a quote

Copy a commercial inspection brief

Site address/use: __. Distribution boards and circuit schedules: __. Previous report and unresolved observations: __. Areas included and access limitations: __. Operating hours: __. Equipment requiring an agreed shutdown: __. Isolation approver and site contact: __. Required report and delivery date: __. Confirmed payer/order reference: __. Ask for board and circuit counts, working hours, return visits, limitations and VAT treatment to be explicit.

Inspection is separate from remedial work

Ask which inspection, tests and report the price covers, and how any further investigation or repairs will be quoted. Compare inspections on the same scope before comparing totals. At handover, retain the circuit schedules, coded observations, limitations and next inspection recommendation. Use the linked EICR repair and commercial maintenance briefs for report-led scope and site arrangements. Request a quote for your electrical inspection through Tradehand.

Scope electrical repairs from your EICR

Prepare a commercial maintenance brief

Request a quote

Sources

  1. HSE, Electricity at Work Regulations 1989: guidance on regulations

Questions people ask

How is a commercial EICR priced?

In the UK, a commercial EICR is priced on survey. The quote follows the boards and circuits in scope, access, out-of-hours work, and the report required.

How often does a commercial premises need an EICR?

HSE's guidance on regulation 4(2) does not set one frequency. Practical experience of use may indicate an adjustment, and the frequency is a matter for the judgement of the dutyholder.

Can testing be phased around business operations?

Yes, if the inspector and dutyholder agree a safe isolation plan that still covers the full intended scope. Critical systems and inaccessible circuits must not be silently omitted from the report.

Get a fixed price for this job.

Tell us about your home and see prices from local electricians.