Electrician Business Safety: Duties, CDM Roles and Records

Know which duty you hold, agree project roles and keep useful site and handover records. A fictional domestic-project record map connects HSE guidance to the job file.
Sol Wright, Co-founder, Tradehand6 min read
Electrician Business Safety: Duties, CDM Roles and Records

Match the duty to the work and jurisdiction

This is a business-record guide for work in Great Britain. HSE’s Electricity at Work Regulations guidance explains duties on employers, employees and the self-employed. Responsibility depends on the matters within a person’s control. Northern Ireland has its own health and safety authority and legislation.

Plan the work with people who have the necessary competence. A job sheet can record agreed responsibilities, site information and decisions; it does not establish competence or replace the project’s safety arrangements.

Sources: HSE: Electricity at Work Regulations guidance, HSR25, HSENI: electrical safety

Electricity at Work: keep the qualifiers with the requirement

The Regulations impose an absolute duty, not merely a reasonably-practicable one, in relation to several key requirements. That does not make every requirement absolute.

  • Regulation 4(1)–(3): construction and maintenance of systems, and work activities, carry the “so far as is reasonably practicable” qualifier in preventing danger.
  • Regulation 7: insulation or other protection/placing of conductors includes the reasonably-practicable qualifier.
  • Regulation 4(4): protective equipment has its own requirements for suitability, maintenance and proper use. Do not extend the qualifier from 4(1)–(3) to this paragraph.

Read the full requirement and HSE’s explanation when planning work. Record who is responsible for the assessment and where the current arrangements are held. This record map supplies no isolation, testing or live-working procedure.

Sources: HSE: Electricity at Work Regulations guidance, HSR25, Electricity at Work Regulations: Regulation 4, Electricity at Work Regulations: Regulation 7

Domestic construction: agree CDM roles before the start

CDM 2015 applies to construction projects in Great Britain, including domestic work. On a single-contractor project, the contractor prepares the construction phase plan before setting up the site. A small project can have a proportionate plan; small size does not remove that requirement.

Where more than one contractor is involved, use HSE’s guidance to establish the principal designer and principal contractor arrangements. For domestic clients, client duties normally pass to the sole contractor or principal contractor; a designer can take them on through a written agreement. If appointments are absent, HSE explains how duties fall on the people controlling the relevant phases. Record the actual arrangement and resolve gaps before starting.

Sources: HSE: domestic clients and CDM roles, HSE: construction phase plan for small projects

Fictional kitchen project: copy this record map

Fictional example. A homeowner commissions a kitchen refurbishment involving a builder and an electrician. The number of trades does not identify who was appointed to manage the project. Confirm the arrangement using the CDM guidance, then complete this map.

  • Project and scope: address/job reference ___; agreed work and exclusions ___; quote revision ___.
  • Actual roles: client type ___; contractors ___; principal designer/principal contractor arrangements ___; appointment/agreement held at ___.
  • Plan and site information: construction phase plan owner ___; current version ___; site information supplied by ___; unresolved information ___.
  • Coordination: who agrees sequencing and site access ___; how changes reach affected workers ___; review date ___.
  • Work records: assessment/competence records held at ___; equipment and inspection records held at ___; person responsible ___.
  • Handover: work actually completed ___; outstanding items ___; relevant certificate/report reference ___; recipient and date ___.

This is an index to the real documents, not a construction phase plan or an appointment. Keep the job sheet, approved scope and changes together so the people responsible can find them.

Source: HSE: construction phase plan for small projects

Incidents and handover need their own records

Use HSE’s RIDDOR guidance to determine whether an incident is reportable, who reports it and the applicable timing. Record the incident and resulting action; an internal note or insurer notification does not itself make a statutory report.

Choose the electrical record for the actual work. An EIC records installation work; an EICR records an inspection of an existing installation. Keep the actual extent, results and responsible signatures, with any separate notification/compliance documents where required.

The first-job handover pack connects quote, changes and completion evidence. The current-rules board points to dated changes and primary sources.

Sources: HSE: RIDDOR, IET: model electrical forms

Sol Wright

Sol is a co-founder of Tradehand, a UK trades marketplace More from Sol

Frequently asked questions

Does every Electricity at Work duty have the same qualifier?

No. Read each provision. Regulation 4(1)–(3) and Regulation 7 include reasonably-practicable qualifiers; Regulation 4(4) has separate protective-equipment requirements.

Does this worksheet replace a construction phase plan?

No. It indexes the real project records. Use HSE’s CDM guidance to establish the required plan and actual roles.

Get on with the work.

Spend less time on admin and more on the work you love.

A clay decorator rolling sage green paint onto a living room wall
A clay carpenter hanging an oak internal door
A clay tiler taking a phone payment from a homeowner after a job
A clay plasterer smoothing a bedroom wall with a trowel
A clay electrician testing a socket in a living room
Two clay tradespeople sharing a business card beside an open van