Part P: Notification Routes and the Electrical Handover Pack

Electrical Certification and Building Compliance Are Separate
An Electrical Installation Certificate records new electrical work and the responsible person's design, construction, inspection and testing declarations. Building Regulations notification is a separate process where required. Issuing an EIC does not submit a notification or create competent-person scheme membership.
Choose the country and applicable route before agreeing the work. Part P guidance for England should not be applied as a complete UK building-control checklist. Wales has separate guidance; Scotland uses its building standards/warrant arrangements; Northern Ireland has its own building regulations.
Sources: IET: Certification schemes, Welsh Government: Electrical work, Scottish Government: Verification and certification
England: Check the Work, Not Only the Room Name
England's notification categories include a new circuit, replacement consumer unit, and additions or alterations to an existing circuit in a defined special location. The location definitions matter. Not every replacement light fitting in a bathroom, and not every kitchen or outdoor alteration, is automatically notifiable. Use the actual work and location against England's Approved Document P.
Work outside the notification categories still needs to meet the applicable electrical safety requirements. Notification status does not decide whether the installer is competent or which electrical certificate records the performed work.
Arrange the Applicable England Route Before Starting
The IET describes self-certification by a registered competent person, registered third-party certification and building-control certification. Scheme registration must cover the work being self-certified. Where a registered third-party route is used, the certifier is appointed before work starts. Where the building-control route applies, arrange notification before work begins.
Ask the scheme, certifier or building-control body to confirm the actual route and required records. An ECS card, Wiring Regulations course or completed EIC alone does not grant building self-certification authority.
Source: IET: Certification procedures
A Country and Responsibility Checklist
- England: check England's Approved Document P, actual notification category and applicable certification route.
- Wales: use Welsh electrical guidance and the applicable approved document; do not import England's reduced notification categories.
- Scotland: check building standards verification and approved certification for the warrant/work.
- Northern Ireland: use the relevant building-control authority and NI requirements for the proposal, rather than an England Part P table.
Write down: installation country, proposed work, route, responsible installer/certifier, who makes any submission, required inspections/records and the document the customer receives. Keep the actual authority's response or scheme confirmation with the job.
The Handover Pack: Which Document Answers Which Question?
| Record | Question answered |
|---|---|
| EIC and schedules | What new electrical work is covered, and who declares responsibility for design, construction, inspection and testing? |
| Minor Works | What addition or alteration to an existing circuit, without a new circuit, is recorded? |
| EICR | What did an inspection of the existing installation find? |
| Building compliance/completion record | What evidence comes from the applicable scheme or building-control route? |
| Agreed scope and completion record | What work was ordered, varied and handed over? |
Fictional example: Ellis agrees a new circuit at a home in England. Before starting, Ellis records the applicable notification route and who handles it. At completion, the EIC describes the actual work and includes its schedules and signer. The separate building compliance record is retained when received. An EICR is not substituted for the EIC or the notification evidence.
Make the Document Responsibilities Part of the Quote
Use the quote to identify the work, certification/handover, approval dependencies and who handles any separate building submission. Keep the actual documents in the job record and provide the relevant handover to the person ordering the work.
The free EIC walkthrough follows the actual blank form. The first-job pack connects that record to scope and agreement. Source check: 2 October 2026.