What the Emergency lighting completion record covers
Record the system, extent of work, design and installation responsibility, inspection and test findings, deviations and sign-off. Completion and periodic-test purposes are selected in the record. The form does not provide the controlled design standard or certify the signer's competence.
Who needs one
- The named persons responsible for the design, installation, verification or test within the recorded scope.
- Record scope: England, Wales, Scotland, Northern Ireland.
- Keep the completed record with the source documents, findings and job reference.
Related templates.
More free certificates.

Electrical
Electrical Installation Condition Report
Full BS 7671 condition report: circuits, test results, C1–C3 & FI codes, Satisfactory/Unsatisfactory outcome.

Electrical
Electrical Installation Certificate
Certify new circuits, installations and consumer unit changes: BS 7671 design, construction and test declarations.

Electrical
Minor Electrical Installation Works Certificate
Certify additions and alterations to existing circuits: the lightweight BS 7671 counterpart to an EIC.
Questions sole traders ask
What is included in the download?
The blank PDF contains the record sections shown below, writing space and sign-off. Its fields come from the record definition used to export this PDF.
Who completes this record?
The named persons responsible for the design, installation, verification or test within the recorded scope.







