Site Induction Checklist

What is it?
A site induction checklist is a document used to deliver and record a consistent health and safety briefing to anyone arriving on a construction site for the first time. It guides the person giving the induction through the topics that must be covered - site layout and rules, welfare facilities, emergency and fire procedures, first aid, the significant hazards on site, PPE requirements, and any permit-to-work areas - and provides a sign-off section where the inducted person confirms they have understood the briefing. It applies to employees, subcontractors, and visitors alike.
About this template
A site induction is the first thing every worker and visitor should receive before they set foot on a construction site, and a site induction checklist makes sure nothing important is missed. It is a short, structured briefing that covers the site rules, the welfare facilities, what to do in an emergency, the key hazards on this particular site, and the personal protective equipment required. Inducting people properly is part of managing a site under the Construction (Design and Management) Regulations 2015, and a signed induction record keeps who was briefed, by whom and on which site arrangements. Ask the person to explain the emergency route and raise any questions before signing.
When to use
- Before any worker, subcontractor, or trade starts work on the site for the first time
- When a visitor, supplier, client, or inspector needs access to an active construction site
- At the start of a new project, so the first wave of workers is inducted before work begins
- When the site changes significantly - new hazards, a new phase, or revised site rules - and a re-induction is needed
- When a worker returns to a site after a long absence and needs to be brought back up to date
- Whenever the principal contractor or builder needs a documented record that everyone on site has been briefed
Tips
- 1Induct everyone before they start - no exceptions. A subcontractor who 'knows the site' from a previous job still needs the current hazards and rules, and a visitor on site for five minutes can still walk into danger
- 2Make the induction a real conversation, not a form to sign at the gate. Walk the key points, point out the assembly point and welfare, and check the person has understood
- 3Keep the signed records on site and filed for the project - the induction sheet is your evidence that a worker was briefed if there is ever an incident or HSE involvement
- 4Tailor the hazards section to the actual site - generic inductions miss the point. The excavation, the scaffold, the delivery route, the asbestos survey findings: brief what is really there today
- 5Re-induct when the site changes. A new phase, a major delivery schedule, or a newly discovered hazard all justify a quick refresher so nobody is working to out-of-date information